Our wORK / Projects / Industrial / Palouse Wind Farm Concrete Foundations

Palouse Wind Farm Concrete Foundations

Lydig was responsible for setting the concrete for 58 wind turbine generator foundations for the Palouse Wind Farm south of Rosalia, Washington. The project was completed in 12 weeks, with excavation quantities in excess of 90,000 bank cubic yards, the pouring of over 24,000 cubic yards of concrete, and setting of 7,192 anchor bolts.

Palouse Wind Farm Concrete Foundations
Owner

RMT, Inc.

Cost

$5.3M (2012)

Photo Credit

Kathlyn Toney

Lydig was responsible for setting the concrete for 58 wind turbine generator foundations for the Palouse Wind Farm south of Rosalia, Washington. The project was completed in 12 weeks, with excavation quantities in excess of 90,000 bank cubic yards, the pouring of over 24,000 cubic yards of concrete, and setting of 7,192 anchor bolts.

Palouse Wind Farm Concrete Foundations 1
Palouse Wind Farm Concrete Foundations 2