The original school was constructed in the 1950’s, with additions in the 1960’s and the 1980’s. Reconstructed on its own site, the new school features 30 classrooms, a library, theater, gymnasium, cafeteria, kitchen, and administrative offices. The project was completed in multiple phases beginning with the demolition of the existing elementary school. The project includes a surface lot with 120 parking spaces for faculty and visitors plus student bus pick-up/drop-off areas. The project was constructed with adherence to WSSP standards.